Toggle menu

Local List Glossary

Foul Drainage Assessment

When is this required?

  • development proposals that would result in the disposal of foul sewage, effluent or trade waste not through a mains connection to a public sewer.

What information is required?

A non-mains drainage assessment should be used to establish whether non-mains drainage, either a new system or connection to an existing system, would be acceptable. The Environment Agency requires applicants to provide evidence that a connection to the public sewer is not feasible.

The assessment should include: the method of storage, treatment and disposal, an assessment of site suitability and a demonstration as to why the development cannot connect to the public mains sewer. 

The assessment should be provided through the completion of the Environment Agency's Foul Drainage Assessment form.

Relevant policy and reason for the document:

North Devon and Torridge Local Plan 2011-2031: http://consult.torridge.gov.uk/portal/planning/localplan/adoption/

North Devon and Torridge Local Plan Policy ST02: Mitigating Climate Change

Further information sources:

Environment Agency Foul Drainage Assessment Form (FDA): https://www.gov.uk/government/publications/foul-drainage-assessment-form-fda1

Share this page

Share on Facebook Share on Twitter Share by email